Picture caption: Nov. 10, 1924 looking east from Downstream End Conduit, Downstream Portion of Diversion Dam.

        This is the same area as prior picture except from other side of river. Core of dam is on upper right. Concrete pillar below is the end of the conduit, which is to carry the river during construction the project. Also, it could be used to drain the pond if ever needed.

 

Home