March 29, 2002 Clean up continues!
|
Clean-up crew taking a break. |
Shovel picks through the rubble. |
|
Variety of equipment in the Spring Street lot. |
Separating steel beams from the other rubble. |
|
|
|
|
Some areas are already down to bedrock (or sidewalk in this case). |
Men in breathing masks examine debris |
|
Site is posted with these warnings. |
This small machine is monitoring the air quality around the perimeter of the site. Note the hazard tape that surrounds the site. |
|
View from in front of the Superior Grill. |
|
|
|
This would be the basement of the Clemens building. |